
Construction machinery and vehicles · Pile drivers
Crawler Pile Driver for Solar Posts
Built for setting the posts of ground-mounted photovoltaic plants, for pile lengths from 3 to 6 m. The upper structure turns a full 360 degrees, and operating weight is 7.5 to 7.8 t.
On request
The price depends on quantity, specification and place of delivery.
Description
The machine runs on tracks and has an open operator station. Depending on the version it weighs 7.5 to 7.8 t. No further factory data is available to us for this machine so far.
Technical data
- Pile length
- 3 to 6 m
- Slew angle
- 360°
- Operating weight
- 7.5 to 7.8 t
More from Pile drivers.
View all No image yet
Construction machinery and vehicles · Pile drivers
Solar Pile Drilling Rig HWL-390-H
- Rated power
- 85 kW
- Weight
- 7410 kg
- Drilling diameter
- 76-400 mm
On request
No image yet
Construction machinery and vehicles · Pile drivers
Long Auger Piling Rig
Wheeled rig with a continuous auger along the mast, built for installing bored piles. Borehole diameter ranges from 0.5 to 2 metres.
On request
No image yet
Construction machinery and vehicles · Pile drivers
Pneumatic Pile Driver for Flood Control
- Hammer size
- 20 to 70 kg
- Rated working pressure
- 0.4 to 0.7 MPa
- Blow rate
- 1000 BPM
On request
No image yet
Construction machinery and vehicles · Pile drivers
Guardrail Post Pile Driver
- Rated power
- 33 kW
- Rock drill size
- 75/85#
- Driving depth
- 3,1 m
On request








