No image yet
Construction machinery
Crawler Pile Driver for Solar Posts
Built for setting the posts of ground-mounted photovoltaic plants, for pile lengths from 3 to 6 m. The upper structure turns a full 360 degrees, and operating weight is 7.5 to 7.8 t.
The machine runs on tracks and has an open operator station. Depending on the version it weighs 7.5 to 7.8 t. No further factory data is available to us for this machine so far.
Technical data
- Pile length
- 3 to 6 m
- Slew angle
- 360°
- Operating weight
- 7.5 to 7.8 t
